Skip to content
Program Loading

Checking access

Project Loading

Sync and health

Where every number on every other screen came from, and how old it is. A roll-up is always the worst of the Jira projects behind it, with that Jira project named.

Running a sync reads every registered Jira project, so it needs an App admin.

Loading sync status

Connections the sync reads Jira with

The background load runs on a connection the Planning Assist owners set up, not on your own Jira account, which is why these pages keep working whether or not you are connected. Only an App admin can see which connection loads which Jira project. Your own connection

Recent runs

Loading recent sync runs

Issue keys are not on this list. They are on the run detail, which is App admin only.